Plan well. Not because it’s cheap—but because the alternative is a debt you cannot invoice.
Marcus walked up, tablet in hand. His face was gray. planningpme cost
The contingency line in the budget was 5%. Industry standard was 15-20% for a bridge with unknown subsurface conditions. Elena had written a memo. She’d printed it, signed it, and filed it. Plan well